SDR 95ZZZX3262

Service difficulty report · Bushing · Bnorm BN2A26

Difficulty date
June 6, 1995
Submitted
March 26, 2000
Operation
Air carrier
Aircraft
N36MR
Make and model
Bnorm BN2A26
Aircraft serial
900
Engine
Lyc O540E4C5
Part
Bushing
Condition
Loose
Location
Impulse Coupling
Part time
1,122 hours
Stage of operation
IN
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING COMPLIANCE OF AD78-09-07R3, MAGNETO IMPULSE COUPLING INSPECTION, DISCOVERED THAT PREVIOUS COMPLIANCE WITH LYCOMING SI NR 114D, THE MAGNETO DRIVE BUSHING HAD WORKED LOOSE. FABRICATED AND RE-INSTALLED NEW BUSHING IAW LYCOMING SI NR 1140.