SDR 9600559885

Service difficulty report · Pt2 Probe · Doug DC951

Difficulty date
January 3, 1995
Submitted
March 26, 2000
Operation
Air carrier
Aircraft
N401EA
Make and model
Doug DC951
Aircraft serial
47682
Engine
Pwa JT8D17
Part
Pt2 Probe
Condition
Iced Up
Location
Nr 1 Engine
Stage of operation
TO
Nature of condition
R
Precautionary procedure
C, D

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

NR 1 ENGINE EPR DID NOT REACH TARGET ON TAKEOFF ROLL. THE TAKEOFF WAS ABORTED AND THE FLIGHT RETURNED TO THE GATE. MAINTENANCE INSPECTED THE ENGINE AND REMOVED ICE OBSTRUCTING THE PT2 PROBE. ENGINE CHECKED OK ON RUNUP.

More about the Doug DC-9-51