What was found
DURING OPERATIONAL TEST OF PAX O2, PSU AT ROW 6CD FAILED TO DEPLOY. RESECURED CONNECTOR TO DEPLOY SOLENOID. SUBSEQUENT OPS TEST OF PAX O2 SYSTEM, AMM 35-20-00 PROVES GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING OPERATIONAL TEST OF PAX O2, PSU AT ROW 6CD FAILED TO DEPLOY. RESECURED CONNECTOR TO DEPLOY SOLENOID. SUBSEQUENT OPS TEST OF PAX O2 SYSTEM, AMM 35-20-00 PROVES GOOD.