Service difficulty report · Relay · Doug DC983

Difficulty date
June 4, 2015
Submitted
June 8, 2015
Operation
Air carrier
Aircraft
N9619V
Make and model
Doug DC983
Aircraft serial
53566
Aircraft time
50,373 hours, 24,247 cycles
Part
Relay
Part number
1030004001
Condition
Faulty
Location
Fuel System
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AIR INTERRUPT, EMER NOT DECLARED, LANDING UNEVENTFUL & ACFT NOT OVERWEIGHT. DURING CRUISE, CTR FUEL TANK BOOST PUMP BECAME INOPERATIVE. R & R UNIVERSAL FAULT INTERRUPTER RELAY TOP ASSEMBLY FOR CTR FUEL PUMP IAW AMM 28-20-28. PERFORMED OPERATIONAL CHECK. SYS CHECKED NORMAL.