What was found
OPERATIONAL TEST OF EMERGENCY POWER SUPPLY UNIT (CIDS 1) SHOWS THE FOLLOWING FAULTS. REPLACED THE POWER SUPPLY BATTERY IAW AMM 33-51-38. ACCOMPLISHED SATISFACTORY OPERATIONAL TEST. AIRCRAFT WAS GROUNDED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
OPERATIONAL TEST OF EMERGENCY POWER SUPPLY UNIT (CIDS 1) SHOWS THE FOLLOWING FAULTS. REPLACED THE POWER SUPPLY BATTERY IAW AMM 33-51-38. ACCOMPLISHED SATISFACTORY OPERATIONAL TEST. AIRCRAFT WAS GROUNDED.