What was found
TUL - BULGE IN FUSELAGE SKIN STA 1050 - STA 1060, STR 27R. CUT OUT AND REMOVED DAMAGED SECTION OF SKIN AND STR 27R. INSTALLED DOUBLER AND STRINGER REPAIR PER SRM 53-30-3 AND SRM 53-10-3. TST: 51,239 HOURS. CYCLES, 31,088. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
TUL - BULGE IN FUSELAGE SKIN STA 1050 - STA 1060, STR 27R. CUT OUT AND REMOVED DAMAGED SECTION OF SKIN AND STR 27R. INSTALLED DOUBLER AND STRINGER REPAIR PER SRM 53-30-3 AND SRM 53-10-3. TST: 51,239 HOURS. CYCLES, 31,088. (X)