What was found
R ENG FIRE LP 1 MSG. DEFERRED IAW B767 MEL 26-11-1-1. MBCB NOV 18 2026 MAINTENANCE PROCEDURES C/W, PLACARDS INSTALLED. A/C RELEASED ETOPS 120. A/C RETURNED TO SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
R ENG FIRE LP 1 MSG. DEFERRED IAW B767 MEL 26-11-1-1. MBCB NOV 18 2026 MAINTENANCE PROCEDURES C/W, PLACARDS INSTALLED. A/C RELEASED ETOPS 120. A/C RETURNED TO SERVICE.