Service difficulty report · Trim System · Cessna 750

Difficulty date
June 2, 2022
Submitted
June 6, 2022
Operation
Air carrier
Aircraft
N752WJ
Make and model
Cessna 750
Aircraft serial
7500034
Aircraft time
14,247 hours, 8,208 cycles
Part
Trim System
Condition
Malfunctioned
Stage of operation
CL
How discovered
O
Nature of condition
F
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ON TAKEOFF THE PILOT REPORTED THAT THEY HAD A PRIMARY TRIM FAILURE AND A MACH TRIM OFF INDICATION. THE PRIMARY TRIM FAILURE WAS DUE TO THE FACT THAT THE PILOT IN COMMAND DID NOT TURN ON THE MACH TRIM. WE PERFORMED A FUNCTIONAL CHECK OF THE SYSTEM AND FOUND THAT SYSTEM HAD NO FAULTS.

More about the Cessna 750