Service difficulty report · Vane · Airbus A320214

Difficulty date
March 11, 2022
Submitted
March 16, 2022
Operation
Air carrier
Aircraft
N939AV
Make and model
Airbus A320214
Aircraft serial
4939
Aircraft time
21,845 hours, 22,633 cycles
Engine
Cfmint CFM565B43
Engine time
22,972 hours, 19,693 cycles
Part
Vane
Part number
39680012
Part serial
EM6020347
Condition
None
Location
Zone 500
Part time
2,235 hours, 2,695 cycles
Component
Engine · Cfmint · CFM565B43
Component part number
CFM565B43
Stage of operation
TO
How discovered
V
Nature of condition
J
Precautionary procedure
C

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

PROBLEM

11.MAR.2022 WO 54'386'879=> IN ACCORDANCE TSM 75-30-00-810-837-A FAILURE OF THE CONTROL OF THE VBV ACTUATOR ON ENGINE 1-CHANEL B-FAULT CONFIRMATION WAS PERFORMED IN ACCORDANCE AMM 73-29-00-710-040 OPERATIONAL TEST OF FADEC 1B ON THE GROUND (WITH ENGINE MOTORING) AND THE TEST GIVE VBV ACT, HMU FAULT AND IN ACCORDANCE FAULT ISOLATION STEP 4.B.1 VISUAL INSPECTION OF ALL THE VBV DOORS ACTUATORS AND FLEXIBLE SHAFTS WAS PERFORMED AND NO ANOMALIES WERE FOUND. CONTINUE PERFORM NEXT STEP 4.B.2 AMM 75-31-00-200-002-OPERATE MANUALLY THE VBV SYSTEM TO SURE THAT IT MOVES SMOOTHLY AND FREELY. 12.MAR.2022 WO 54'386'879=> DURING TAKE OFF ECAM MESSAGE - ENG 1 COMPRESSOR VANE

ACTION TAKEN 12.MAR.2022 WO 54'386'879=> IN ACCORDANCE WITH TSM TASK 75-30-00-810-837-A STEP 4.B.1.2:(A)1A AND B THE REMOVAL AND ISNPECTION THE FUEL GEAR MOTOR AND STOP MECHANISM WERE PERFORMED SATISFACTORY AND WAS FOUND IN NORMAL CONDITION

13.MAR.2022 WO 54'386'879=>IN ACCORDANCE WITH AMM 75-31-30-000/400-001 THE FELXIBLE SHAFTS WAS REMOVED AND WAS INSPECTED AND WAS REPLACED 2 FLEXIBLE SHAFTS, THE VBV ACTUATORS WERE OPERATED MANUALLY IN BOTH DIRECTIONS AND WAS FOUND IN GOOD CONDITION .

14.MAR.2022 WO 54'386'879=>IN ACCORDANCE WITH AMM TASK 75-31-50-000/400-002-A THE BLEED VALVE AND MASTER BALLSCREW ACTUATOR ASSEMBLY WAS REPLACED