What was found
HYD G RSVR LO LVL WAS PRESENTED ON ECAM ECAM ACTIONS WAS PERFORMED. IAW TSM 29-11-00-810-803-A WAS FOUND A LEAK COMING FROM PRESSURE PIPE IN THE GREEN HYD SISTEM IN THE NGINE PYLON, IAW TFU 29.11.00.018 AND AMM TASK 29-11-49-000-814-A REMOVAL OF THE PRESSURE PIPE IN THE GREEN HYD SYSTEM IN THE ENGINE PYLON WAS PERFORMED. IAW AMM TASK 29-11-49-400-814A INSTALLATION OF GREEN HYDRAULIC SYSTEM IN THE ENGINE 1 PYLON WAS INSTALLED AND IN ACCORDANCE 12-12-29-611-001 SERVICING WAS PERFORMED AND DRY MOTORING WAS ACCOMPLISHED TEST OF TRHUST REVERSER WAS SATISFACTORY. IAW AMM 29-00-00-870-003-A, BLEEDING PROCEDURE OF GREEN HYDRAULIC SYSTEM WAS PERFORMED SATISFACTORY.