What was found
PILOT REPORT 28.FEB.2023 WO 16'893'219=> IDG 2 OIL PRESS CAME OUT AT APROX 80 KTS DURING TAKE OFF ROLL ECAM IDG 2 OIL PRESS CAME OUT AT APROX 80 KTS, AS A RESULT THE TAKE OFF WAS REJECTED
ACTIONS TAKEN: 28.FEB.2023 WO 16'893'219=> THIS ITEM IS TRANSFERED TO DMI MEL 24-20-01-PROV 2 W/O 16893219 WAS PERFORMED MEL PROCEDURE 230-TSR-2023-02-641.
02.MAR.2023 WO 16'893'219=> IAW AMM 24-21-51-000/400-040-B REV 63, 01 FEB 2023 WAS REPLACED IDG ENG RH. PENDING OPERATIONAL TEST OF THE IDG.