What was found
PHX - DURING SCHEDULED D-CHECK, FOUND FRAME SPLICE AT BS 947, STRINGER 25R CORRODED. REPAIRED PER SRM. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PHX - DURING SCHEDULED D-CHECK, FOUND FRAME SPLICE AT BS 947, STRINGER 25R CORRODED. REPAIRED PER SRM. (M)