What was found
TRANSFERING ACFT POWER FROM GROUND POWER TO APU POWER SELECTED THE LT APU SWITCHED TO ON AND THE LT SOURCE OFF LIGHT STAYED ON. ACFT GROUNDED. GROUND VERIFICATION TEST GOOD, IAW FIM 24-21 TASK 823. NO HISTORY PAST 30 DAYS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
TRANSFERING ACFT POWER FROM GROUND POWER TO APU POWER SELECTED THE LT APU SWITCHED TO ON AND THE LT SOURCE OFF LIGHT STAYED ON. ACFT GROUNDED. GROUND VERIFICATION TEST GOOD, IAW FIM 24-21 TASK 823. NO HISTORY PAST 30 DAYS.