What was found
RIGHT WHEEL WELL REAR SPAR CENTER SECTION BETWEEN RBL-24.98-RBL-45.64 CRACKED. ACFT GROUNDED. ACCOMPLISHED VERTICAL PRESSURE DECK WEB REPAIR 3, ALTERNATIVE 1 IAW SRM 57-10-10-2R-3, THIS IS A CATEGORY B REPAIR WITH AN INITIAL INSPECTION THRESHOLD OF 56,000 FLIGHT CYCLES AFTER REPAIR INSTALLATION, METHOD OF INSPECTION HFEC WITH INSPECTION INTERVAL OF 36,000 FLIGHT CYCLES, REMOVED DOT.