What was found
MAIN DECK FLOORBEAM CRACKED. BS 540, BL 0 - LBL 5. ACFT GROUNDED. REMOVED CRACKED FLOORBEAM IAW SRM 51-40-02 LOCATED, DRILLED, AND INSTALLED NEW FLOORBEAM IAW SRM 51-40-02, 51-40-05 AND DWG 143A0060-51, REV D.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAIN DECK FLOORBEAM CRACKED. BS 540, BL 0 - LBL 5. ACFT GROUNDED. REMOVED CRACKED FLOORBEAM IAW SRM 51-40-02 LOCATED, DRILLED, AND INSTALLED NEW FLOORBEAM IAW SRM 51-40-02, 51-40-05 AND DWG 143A0060-51, REV D.