What was found
FWD CARGO BAY LT SIDE TRANSITION PANEL CORRODED FROM LT BS 500B TO FWD PIT AFT BULKHEAD. ACFT GROUNDED. REMOVED CORROSION IAW SRM 51-10-02, WITHIN LIMITS IAW SRM 53-00-53, FIG 103. ORIGINAL THICKNESS 0.040 WITH 0.038, REMAINING 0.002 MATERIAL REMOVED MEASURED WITH UT GAUGE T8225P, ALODINED AND PRIMED IAW SRM 51-20-01.