What was found
PRESSURIZATION CONTROL PANEL BACKLIGHTING INOPERATIVE. PRESSURIZATION OPERATES NORMALLY. ACFT GROUNDED. PERFORMED FIM 21-31, TASK 803, STEP G. LIGHTING ON PANEL RETURNED TO NORMAL. INTERMITTENT FAULT AND SYSTEM IS SERVICEABLE IAW FIM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PRESSURIZATION CONTROL PANEL BACKLIGHTING INOPERATIVE. PRESSURIZATION OPERATES NORMALLY. ACFT GROUNDED. PERFORMED FIM 21-31, TASK 803, STEP G. LIGHTING ON PANEL RETURNED TO NORMAL. INTERMITTENT FAULT AND SYSTEM IS SERVICEABLE IAW FIM.