What was found
DURING CLIMB OUT, RECEIVED AN AUTO FAIL LIGHT FOR THE PRESSURIZATION SYSTEM, PERFORMED QRH, WENT TO ALTERNATE MODE, SYSTEM OPERATED NORMALLY. ACFT GROUNDED. REMOVED AND REPLACED THE AFT OUTFLOW VALVE ASSEMBLY IAW AMM 21-31-03. SYSTEM GROUND TESTED GOOD. AUTO FAIL LIGHT DID NOT RETURN, PRESSURE CONTROLLER NR 1 AND PRESSURE CONTROLLER NR 2, NO FAULTS RECORDED.