What was found
FOLLOW-UP TO NR 2 IDG CONTINUED FREQUENT SERVICING. REPLACE IDG FOR BENCH CHECK. GROUNDED - YES. REMOVED AND REPLACED NR 2 IDG PER AMM TASK 24-11-11 ETOPS SIGNIFICANT SYSTEM GROUND VERIFICATION TEST COMPLETED SUCCESSFULLY.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
FOLLOW-UP TO NR 2 IDG CONTINUED FREQUENT SERVICING. REPLACE IDG FOR BENCH CHECK. GROUNDED - YES. REMOVED AND REPLACED NR 2 IDG PER AMM TASK 24-11-11 ETOPS SIGNIFICANT SYSTEM GROUND VERIFICATION TEST COMPLETED SUCCESSFULLY.