What was found
AFT CARGO COMPARTMENT, RIGHT SIDE FLOOR TO SIDEWALL TRANSITION PANEL HAS APPROX 29 SPOTS OF CORROSION ON UPPER SURFACE BETWEEN STATIONS 727 AND STATION 727I +8. GROUNDED - YES. AREA FROM STA 727(+10 TO STA 727) +8 FOUND TO BE OUT OF LIMITS IAW SRM 53-60-53-01-2.0 ORG MAT .040 MAT LOSS .030. REMAINING THICKNESS IS .010. REMOVED DAMAGED SECTION FROM STA 727C TO 10 TO 7271+8 IAW 51-40-02. FABRICATED NEW PANEL FROM STA 737C+10-7271+8 IAW 51-20-01. PRIMED IAW SOPM 20-41-02 AND INSTALLED NEW TRANSITION PANEL FROM STA 727C + 10 TO 7271+01 IAW DWG 146A7500 REV C SHEET 0037 AND SRM 51-40-02.