Service difficulty report · Wire Harness · Boeing 737990ER

Difficulty date
January 10, 2019
Submitted
February 28, 2019
Operation
Air carrier
Aircraft
N448AS
Make and model
Boeing 737990ER
Aircraft serial
36356
Aircraft time
11,204 hours, 3,728 cycles
Part
Wire Harness
Part number
254A122113
Condition
Defective
Location
Cockpit
Stage of operation
IN
How discovered
O
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

WHILE ACCOMPLISHING T/C 78273000 FAULT CODE APPEARED ON NR 1 ENGINE #76-31361, THE START LEVER SIGNALS DISAGREE, LONG TIME. MUST BE CORRECTED IN 450 FLT HRS. GROUNDED - YES. HIGH RESISTANCE D10920 Y2 TO GROUND WITH START LEVER AT IDLE REF FIM 76-11 TASK 801 & WDM 76-21-11. REMOVED AND REPLACED NR 1 ENGINE START LEVER WIRE BUNDLE REF AMM 76-11-02. MASTER DIM AND TEST OPS TEST GOOD REF AMM 33-18-00-710-802. FIRE OVERHEAT DETECTION SYSTEM OPS CHECK GOOD REF AMM 26-10-00-710-801. ENGINE FUEL SPAR VALVE ELECTRICAL CONTROL AND INDICATION TEST GOOD REF AMM 28-22-00-710-801. TEST 13 - ENGINE RUN - EEC BITE CHECK GOOD REF AMM 71-00-00-700-808-F00. THIS CLEARS PLT DEFERRAL. ETOPS GROUND VERIFICATION SUCCESSFUL.

More about the Boeing 737990ER