What was found
FWD PIT FLOOR STRUCTURE, RAIL ASSY P/N 143A9485-35 CORRODED AT STA. 500L. GROUNDED - YES. REMOVED, LOCATED AND DRILLED NEW P/N 143A9485Y35; PO: 943259.2 AND INSTALLED FWD CARGO FLOOR STRUCTURE RAIL ASSY IAW SRM 51-40-02, SRM 51-40-05, BOEING DWG 143A9481.