What was found
CAPTAIN REPORTED THAT DURING CLIMB, THE LT ENG VIBRATION REACHED 4.2 UNITS. PERFORMED FIM 77-31 TASK 801 & FIM 78-01 TASK PROCEDURES, NO DAMAGES WERE FOUND, TESTED CORRECT. AS PRECAUTIONARY ACTION, REPLACED THE VIBRATION MONITOR IAW AMM 77-31-01. TRIM BALANCE WAS PERFORMED IAW AMM 71-00-00, TASK 71-00-00-750-803 804, TESTED CORRECT.