What was found
RT FS 280 BEAM HAS CORROSION DAMAGE. R&R BEAM PER SRM 51-42-06. REINSTALLED RT DRIP TRAY IAW SRM 51-42-13 SB 670BA-53-026. REINSTALLED INTERCOSTALS IAW SRM 51-42-21. REINSTALLED PITOT STATIC LINE THRU BEAM IAW AMM 34-11-02. REPLACED WITH NEW T-BRACKET. REINSTALLED CABLE GUIDE IAW AMM 20-21-00. REINSTALLED PULLEY BRACKET IAW AM 20-21-00. DRILLED BEAM PER SRM 51-40-11. WORK DONE IAW SRM 51-24-16. PERFORMED EDDY CURRENT INSPECTION OF U-BRACKET AND BEAM CUT LINE IAW REO 670 -53-11-047 PER NDTM 51-20-006. NO DEFECTS NOTED. INSTALLED NEW CROSSBEAM.