What was found
WHILE PERFORMING THE EDDY CURRENT OF THE RT BULKHEAD BATHTUB FITTING RECEIVED A RELAVANT CRACK INDICATION AROUND THE RETURN LINE OPENING. FINISHED DRILLING AND FINAL SIZED ALL FASTENER HOLES. APPLIED PRIMER & WET INSTALLED NEW FITTING. ABOVE WORK DONE REF SRM 51-42-21 AND REO PL670-53-61-034. REMOVED CRACKED BULKHEAD BATHTUB FITTING REF SRM 51-42-21. COMPLIED WITH EDDY CURRENT INSP OF ORIGINAL CUTLINE ON RT SIDE AFT PRESSURE BULKHEAD AT FS 1098 IAW NDTM 51-20-006, PART 1. NO DEFECTS NOTED AT THIS TIME. TRIMMED NEW FITTING, DRILLED NEW HOLES FOR HYD LINES & STARTED DRILLING NEW FASTENERS HOLES IAW SRM 51-40-00 AND REO 670-53-61-034. WORK DONE REF SRM 51-42-21 AND REO PL670-53-61-034.