What was found
SCHEDULED INSPECTION AT TIMCO LAKE CITY, FL. FOUND THE LEFT SUBFLOOR MEMBRANE AT BS 737-756 CORRODED AND CRACKED. FORMED, TRIMMED, DRILLED, DEBURRED, TREATED AND PRIMED NEW SUBFLOOR MEMBRANE IAW DC9 SRM 51-10-2, 51-10-4 AND 51-10-3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SCHEDULED INSPECTION AT TIMCO LAKE CITY, FL. FOUND THE LEFT SUBFLOOR MEMBRANE AT BS 737-756 CORRODED AND CRACKED. FORMED, TRIMMED, DRILLED, DEBURRED, TREATED AND PRIMED NEW SUBFLOOR MEMBRANE IAW DC9 SRM 51-10-2, 51-10-4 AND 51-10-3.