What was found
PAE - FLT 7829 - DURING ROUTINE SCHEDULED C-13 MAINTENANCE CHECK, FOUND CORROSION ON FLOOR BEAM STA 1006, RBL 10, WL 208. REMOVED CORRODED SECTION AT BS 1006, LBL 15 TO RBL 45, WL 208. FABRICATED PARTS, ALODINED, PRIMED, AND INSTALLED PER SRM 53-00-51, SRM 53-60-5. (X)