What was found
A/C HAD ROLLING TENDENCIES THROUGHOUT FLT. INSPECTED NR 1, NR 2, NR 7 AND NR 8 CARRIAGE BEARINGS. SHOOK FLAPS. NO PROBLEMS FOUND. INSPECTED AILERON CABLES, PULLEYS, ECT L-R NO DEFECTS. AILERON TRIM CENTERING. OPS CHECK GOOD. C/W RUDDER PCU ADJ-TEST PER MM 27-21-91. NO DEFETS NOTED. INSPECTED GROUND/FLT SPOILER SYSTEMS FOR DAMAGE AND PROPER OPS. NO DEFECTS NOTED. INSPECTED L/E FLAP/SLATS AND T/E FLAPS FOR DAMAGE AND PROPER OPERATION. NO DEFECTS NOTED. PERFORMED INSPECTION OF SPOILERS, FLAPS, SLATS. TEST YAW DAMPER COUPLER PER MM 22-12-00. NO FAULTS NOTED. PERFORMED RUDDER INTERNAL PCU LEAKAGE CHECK PER CARD A8M27001. NO DEFECTS NOTED.