What was found
C-CHECK, CORROSION ON BEAM IN FRONT OF R-1 DOOR FROM BS 324 - 298 RBL 50. REMOVED R-1 MOPSILL PER SRM 51-40-2, FAB DOOR SILL FROM 7075-0 .090, HEAT TREATED TO 7075-T6, INSTALLED MOPSILL IAW SRM 51-40-2, INSTALLED R-1 DOOR DRAIN.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
C-CHECK, CORROSION ON BEAM IN FRONT OF R-1 DOOR FROM BS 324 - 298 RBL 50. REMOVED R-1 MOPSILL PER SRM 51-40-2, FAB DOOR SILL FROM 7075-0 .090, HEAT TREATED TO 7075-T6, INSTALLED MOPSILL IAW SRM 51-40-2, INSTALLED R-1 DOOR DRAIN.