What was found
DURING C-CHECK, THE LT FLOORBEAM AT FRAME 20 WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED THE DAMAGED AREA AND PERFORMED A DOUBLER REPAIR IAW EMB 145 SRM 53-21-10 FIGURE 201. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING C-CHECK, THE LT FLOORBEAM AT FRAME 20 WAS FOUND TO BE CORRODED. MAINTENANCE REMOVED THE DAMAGED AREA AND PERFORMED A DOUBLER REPAIR IAW EMB 145 SRM 53-21-10 FIGURE 201. THE AIRCRAFT WAS APPROVED FOR RETURN TO SERVICE.