Service difficulty report · Rotor · Gulstm G159

Difficulty date
August 21, 2000
Submitted
October 2, 2000
Operation
Air carrier
Make and model
Gulstm G159
Aircraft time
20,517 hours, 4 cycles
Engine
Rroyce DART5298X
Part
Rotor
Part number
139153
Condition
Cracked
Location
Supercharger
Stage of operation
CR
How discovered
O
Nature of condition
D, W
Precautionary procedure
H, O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) CABIN SUPERCHARGER ROTOR FAILED IN FLIGHT.FLIGHT CREW ACTIVATED APU AS ALTERNATE SOURCE OF PRESSURIZATION AND AIR CONDITIONING.