Service difficulty report · Crossover Tube · Skrsky S76A

Difficulty date
February 14, 2002
Submitted
March 4, 2002
Operation
Air carrier
Make and model
Skrsky S76A
Aircraft time
19,933 hours
Engine
Allsn 250C30S
Part
Crossover Tube
Part number
7625002102103
Condition
Cracked
Location
Mlg
Part time
21,169 hours
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) DURING A POST FLIGHT INSPECTION THE AME FOUND A CRACK ON THE MAIN LANDING GEAR CROSS TUBE WHEN REMOVED. THE CRACK WAS FOUND TO BE 360 DEGREES AROUND THE TUBE, ALLOWING SEPARATION OF THE ROD END. THE TUBE WAS REPLACED.