Service difficulty report · Linkage · Bombdr BD7001A10

Difficulty date
February 24, 2005
Submitted
April 1, 2005
Operation
General aviation
Make and model
Bombdr BD7001A10
Part
Linkage
Part number
GL45615011
Condition
Bent
Location
Rat Door
Component
Rat · Hamstd
Component part number
762826B
Stage of operation
CR
How discovered
V
Nature of condition
H, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) AT 41,000' MACH .85 THERE WAS UNCOMMANDED RAT DEPLOYMENT. RAT DID NOT FULLY DEPLOY, LOCK INTO POSITION. STOPPED ABOUT 3 INCHES FROM LOCKED POSITION. BECAUSE THE RAT DID NOT FULLY DEPLOY AND LOCK INTO POSITION, BLADES REMAINED LOCKED AND DID NOT TURN. THEREFORE NO EMERG ELECT OR HYDR PWR WAS AVILABLE TO AC. IT WAS FOUND THAT SWIVEL ROD END ON RAT DOOR LINKAGE WAS BENT, WHICH PREVENTED RAT FROM FULLY DEPLOYING. AC GROUND TESTING, WITH BENT DOOR LINKAGE STILL INSTALLED, RESULTED IN SAME PARTIAL DEPLOYMENT OF RAT. AFTER REPLACEMENT OF BENT DOOR LINKAGE, RAT DEPLOYMENTS ON GROUND RESULTED IN NORMAL OPER WITH NO SIGNS OF DAMAGE. INVESTIGATIONS ARE UNDERWAY TO DETERMINE CAUSE OF UNCOMMANDED AUTO-DEPLOYMENT.