Service difficulty report · Pitot System · Boeing 7377CT

Difficulty date
November 24, 2012
Submitted
September 14, 2015
Operation
General aviation
Make and model
Boeing 7377CT
Part
Pitot System
Condition
Malfunctioned
Stage of operation
TO
How discovered
O
Nature of condition
J
Precautionary procedure
C

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) ON TAKEOFF AT 70 KNOTS, CREW OBSERVED AN IAS INDICATED AIRSPEED DISAGREE MESSAGE ON BOTH PRIMARY FLIGHT DISPLAYS. TAKEOFF WAS ABANDONED. MAINTENANCE PERFORMED FIM 31-62, TASK 876. FOUND RT, F/O PITOT SYS SLOW TO RESPOND AND LAGGING BY 4-6 KNOTS AT ALL SPEEDS. PERFORMED RT PITOT SYS FLUSH AND TESTED PITOT SYSTEMS SERVICEABLE IAW AMM 34-11-00. AIRSPEED SPLIT LESS THAN 2 KNOTS. RAN BOTH ENGINES AND HAD NO ANOMALIES. NO HISTORY OF PROBLEMS WITH THE SYS. ACFT WAS RELEASED FOR SERVICE AND NO FURTHER ISSUE REPORTED.

More about the Boeing 737-7CT