Service difficulty report · Wire Harness · Emb ERJ190100IGW

Difficulty date
February 5, 2013
Submitted
September 14, 2015
Operation
General aviation
Make and model
Emb ERJ190100IGW
Aircraft time
19,065 hours
Engine
Ge CF3410E5A1
Part
Wire Harness
Condition
Failed
Location
Slat System
Stage of operation
AP
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) THE FLIGHT CREW ENCOUNTERED A SLAT FAIL MESSAGE ON APPROACH. THIS RESULTED IN A FLAP 2, SLAT ZERO LANDING CONFIGURATION. A PAN PAN WAS DECLARED AS A PRECAUTION FOR PRIORITY AND POSSIBLE HOT BRAKES. ON ARRIVAL. AFTER LANDING RUNWAY 23, THE ACFT WAS MET BY CFR FOR AN INSPECTION. AFTER THE INSPECTION, THE ACFT WAS TAXIIED TO THE GATE UNDER NORMAL POWER. THERE WAS NO ADVERSE PASSENGER REACTION. REPLACED OTBD RT SLAT HARNESS W611 & W612 IAW AMM 27-83-07/401. SLAT CTRL SYS OPS CHECK CARRIED OUT IAW AMM 27-80-00-710-810-A/500. CHECKED SERVICEABLE. BACKWALL TEMP SENSOR TEST CARRIED OUT IAW AMM 30-11-02-710-810-A. CHECK SERVICEABLE.

More about the Emb ERJ 190-100 IGW