What was found
(CAN) NLG WOULD NOT EXTEND ON APPROACH, ALTERNATE EXTENSION DEPLOYED WITHOUT ISSUE. OPS TEST OF THE NLG WAS CARRIED OUT, GEAR FAILED TO EXTEND. RESISTANCE CHECK OF THE SOLENOID SEQUENCE VALVE WAS FOUND OUT-OF-LIMITS. SOLENOID SEQUENCE VALVE WAS REPLACED. THE NLG ACTUATOR WAS ALSO REPLACED AS THE GLAND SEAL WAS FOUND PARTIALLY DISLODGED. OPS TEST OF LANDING GEAR WAS CONDUCTED PRIMARY AND ALTERNATE EXTENSION CARRIED OUT SATISFACTORILY.