What was found
(CAN) DURING PHASE 66 (CESSNA 560 MM 5- 12-66 AND 55- 10- 01-290 (3) . HORIZONTAL STABILIZER RIB LOCATION BORESCOPE INSPECTION AS WELL AS SL560- 55- 03 REVISION 1 - HORIZONTAL STABILIZER RIB BORASCOPE INSPECTION), 10-12 CRACKED RIBS WERE FOUND IN THE AREAS OF INSPECTION. REMOVAL OF THE UPPER SKINS FOR ADDITIONAL INSPECTION AND REPLACEMENT OF THE CRACKED RIBS IS UNDERWAY. ALL CRACKED RIBS WILL BE REPLACED WITH NEW PARTS IN ACCORDANCE WITH THE SRM.