Service difficulty report · Fuel Nozzles

Difficulty date
May 11, 1996
Submitted
March 26, 2000
Operation
General aviation
Engine
Pwa PW125B
Part
Fuel Nozzles
Condition
Leaking Seal
Location
Nr 1 Eng
Part time
8,123 hours
Stage of operation
IN
Nature of condition
K
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN)PRIOR TO DEPARTURE, FUEL LEAKAGE WAS DETECTED FROM FUEL NOZZLES ON #1 ENGINE. TWO FUEL NOZZLES AND THE FLOW DIVIDER REPLACED. AFTER NEXT FLIGHT, FUEL WAS AGAIN LEAKING. ONE MORE FUEL NOZZLE REPLACED.