Service difficulty report · Wire · Mtsbsi MU2B35

Difficulty date
November 5, 1996
Submitted
March 26, 2000
Operation
Air carrier
Make and model
Mtsbsi MU2B35
Engine
Garrtt TPE3316
Part
Wire
Condition
Broken
Location
Nlg Switch
Stage of operation
AP
How discovered
O
Nature of condition
P, N
Precautionary procedure
L

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) ON APPROACH WHEN GEAR SELECTED DOWN, DID NOT GET A GREEN LIGHT ON THE NOSE GEAR. GEAR CYCLED WITH NO CHANGE. EMERGENCY EXTENSION USED. INVESTIGATION REVEALED A BROKEN WIRE AT THE SWITCH.