Service difficulty report · Control Panel · Lear 60LEAR

Difficulty date
February 20, 1998
Submitted
March 26, 2000
Operation
General aviation
Make and model
Lear 60LEAR
Part
Control Panel
Condition
Overheated
Location
Pwr Relay Nr 5
Part time
511 hours
Stage of operation
IN
Nature of condition
B
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(CAN) GROUND POWER RELAY STUD NR 5 OVERHEATED CAUSING DAMAGE TO WIRES COMMON TO STUD AND LOSS OF POWER FROM GROUND POWER UNIT. DAMAGE CAUSED BY NUT COMING LOOSE ON RELAY K7 STUD. PART TC: 322.