What was found
INSPECTION FOUND RT WING FUEL TANK WIRING OUTER AND INNER INSULATION CHAFING AND ARCING DAMAGE ON FLOAT SWITCH BRACKET ZONE R07-11, LOCATION T2-104, PROBE XORS = 298.500. ALSO FOUND RT WING FUEL TANK WIRING FRAYED AND INNER FERRULE AT TANK PROBE T2-105, ZONE R08, XORS 298.500. BOTH WIRING HARNESSES WERE REPLACED AND FUEL QUANTITY CHECK WAS SATISFACTORY IAW MM 28-41-00. THE ARCING DAMAGE FOUND ON RT WING PILOT VALVE MOUNTING BRACKET WAS BLENDED OUT IAW SRM 57-00-01 AND REPROTECTED IAW SRM 51-20-01.