What was found
RIGHT HORIZ STAB IN SPAR RIB AT STATION 92.70 NR 3 STIFFENER CRACKED AT LOWER SIDE NR 3 FROM FWD. FABRICATED & INSTALLED REPAIR ANGLE AT HORIZ STAB STATION 92.70 RIB NR 3 REPAIR FROM LE IAW SRM 55-10-09 REPAIR 4 FIGURE 202.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RIGHT HORIZ STAB IN SPAR RIB AT STATION 92.70 NR 3 STIFFENER CRACKED AT LOWER SIDE NR 3 FROM FWD. FABRICATED & INSTALLED REPAIR ANGLE AT HORIZ STAB STATION 92.70 RIB NR 3 REPAIR FROM LE IAW SRM 55-10-09 REPAIR 4 FIGURE 202.