What was found
RIGHT HORIZ STAB IN SPAR RIB AT STATION 92.70 NR 2 STIFFENER CRACKED AT LOWER SIDE, NR 2 REPAIR FROM FWD. FABRICATED & INSTALLED REPAIR ANGLE IAW SRM 55-10-09 REPAIR 4 FIGURE 202.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RIGHT HORIZ STAB IN SPAR RIB AT STATION 92.70 NR 2 STIFFENER CRACKED AT LOWER SIDE, NR 2 REPAIR FROM FWD. FABRICATED & INSTALLED REPAIR ANGLE IAW SRM 55-10-09 REPAIR 4 FIGURE 202.