As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
NUMBER 2 PYLON LOWER SPAR WEB MIS-DRILLED DURING ACCOMPLISHMENT OF SRM 54-51-12. INTERIM REPAIR ACCOMPLISHED IAW ECRA 5450-02258. REPAIR HAS BEEN APPROVED AS INTERIM FOR 1 MONTH IAW RDAS 80003171-003-2014 DATED 9-10-14. A NEW RDAS THAT PROVIDES THE INSPECTION & THRESHOLD MUST BE RECEIVED PRIOR TO OCTOBER 10, 2014. IF A NEW RDAS IS NOT RECEIVED PRIOR TO 10-10-14 THE ACFT IS NO LONGER AIRWORTHY.