What was found
DURING HMV-4 WHILE ACCOMPLISHING INSP. OF THE LT SIDE POST FR4 UPPER ATTACHMENT, FOUND CRACK INDICATION ON HOLE LABELE D #3. ACCOMPLISHED INTERIM REPAIR AS PER ECRA 5311-02068 PART 1. CREATED DIP TO ACCOMPLISH PERMANENT REPAIR AS PER PART 3 OF ECRA 5311-02068 ON OR BEFORE THE AIRCRAFT REACHES 35,700 TFC. PLANNING IS TO CONTACT ENGINEERING AFTER 34,700 TFC, BUT BEFORE 35,200 TFC FOR THE PERMANENT REPAIR. INTERIM REPAIR PERFORMED PER PART 1 OF ECRA 5311-02068. ACCOMPLISH PERMANENT REPAIR AS PER PART 3 OF ECRA 5311-02068 ON OR BEFOR E BEFORE THE AIRCRAFT REACHES 35,700 TOTAL AIRCRAFT FLIGHT CYCLES. PLANNING IS TO CONTACT ENGINEERING AFTER 34,700 TOTAL AIRCRAF T FLIGHT CYCLES BUT BEFORE 35,200 TOTAL AIRCRAFT FLIGHT CYCLES F OR THE PERMANENT REPAIR.