What was found
ACCOMPLISH A PERMANENT REPAIR PER PART 3 OF ECRA 5330-06559 ON O R BEFORE 03 DEC 2019. PLANNING TO CONTACT ENGINEERING AFTER 01 O CT 19 BUT BEFORE 31 OCT 19 FOR THE PERMANENT REPAIR. PART 1 HAS BEEN COMPLIED WITH IN THIS ECRA 5330-06559. ACCOMPLISH A PERMANENT REPAIR PER PART 3 OF ECRA 5330-06559 ON O R BEFORE 03 DEC 2019. PLANNING TO CONTACT ENGINEERING AFTER 01 O CT 19 BUT BEFORE 31 OCT 19 FOR THE PERMANENT REPAIR. PART 1 HAS BEEN COMPLIED WITHIN THIS ECRA 5330-06559. ACCOMPLISH A PERMANENT REPAIR PER PART 3 OF ECRA 5330-06559 ON O R BEFORE 03 DEC 2019. PLANNING TO CONTACT ENGINEERING AFTER 01 O CT 19 BUT BEFORE 31 OCT 19 FOR THE PERMANENT REPAIR. PART 1 HAS BEEN ACCOMPLISHED. OPBLM CHRISTIANSEN TOMC-APPROVAL FROM SC1ELBYC COMMENT **LH AND RH FR 35-36 PRESSURE PANEL CRACKS, INTERIM REPAIR REFER ENCED IN ECRA 5330-06559. OPBLM CHRISTIANSEN QC REVIEWED. QC REVIEWED. ACCOMPLISH A PERMANENT REPAIR PER PART 3 OF ECRA 5330-06559A ON OR BEFORE 03 DEC 2019. PLANNING TO CONTACT ENGINEERING AFTER 01 OCT 19 BUT BEFORE 31 OCT 19 FOR THE PERMANENT REPAIR. PART 1 HAS BEEN COMPLIED WITH PER ECRA 5330-06559A. DEC 2019.