What was found
FRAME DENTED AT BS 5OOG INNER CORD AT S-24L TO S-26L FRAME AT STA 500G REPAIRED PER EC/RA5311-02279 REF FLEET CYCLE L OG PG.9702467 FOR ALL WORK PERFORMED. INITIATE D.I.P PER EC/RA 5 311-02279 STEP 11 TO "ACCOMPLISH INSPECTION REQUIREMENTS ON OR BEFORE THE AIRCRAFT REACHING 75,000 TOTAL FLIGHT CYCLES. PLANNIN G TO CONTACT ENGINEEING AFTER 68,000 TOTAL FLIGHT CYCLES BUT BEF ORE 69,000 TOTAL FLIGHT CYCLES FOR THE INSPECTION REQUIREMENTS" OK TO DIP FRAME AT STA 500G REPAIRED PER EC/RA5311-02279 REF FLEET CYCLE L OG PG.9702467 FOR ALL WORK PERFORMED. INITIATE D.I.P PER EC/RA 5 311-02279 STEP 11 TO "ACCOMPLISH INSPECTION REQUIREMENTS ON OR BEFORE THE AIRCRAFT REACHING 75,000 TOTAL FLIGHT CYCLES. PLANNIN G TO CONTACT ENGINEEING AFTER 68,000 TOTAL FLIGHT CYCLES BUT BEF ORE 69,000 TOTAL FLIGHT CYCLES FOR THE INSPECTION REQUIREMENTS TOMC-APPROVAL FROM SC1ELBYC COMMENT QC REVIEWED RECORDS UPDATE...UK/U354344 QC REVIEWED INIT: PLN/ENG >68,000<69,000 TAFC TA: 75,000 TAFC...UK/U354344