What was found
(B757-53-3-0577) MAIN CABIN STA 1280 RH FRAME HAS MULTIPLE GOUGE S FROM STR 9R - STR 15R. REF ST-SAA NR 0077827. BLENDED AND CHECK LIMITS TO 5EA GOUGES ON FRAME AT STA 1280 FROM S-9R TO S-15R, 2 AREAS IN LIMITS AND 3 AREAS OUT OF LIMITS IAW ''S OF FRAME IAW ECRA 5311-02325 REV.-A PART 1 INERIM REPAIR. DIP INITIATED TO ACCOMPLISH INSPECTION REQUIREMENTS PER PART 2 SRM 53-00-07-A1 FIG 101. REPAIRED 3EA OUT OF LIMIT AREA PER PART 2 INSPECTION REQUIREMENTS REQUEST DIP TO ACCOMPLISH INSPECTION REQUIREMENTS PER ECRA 5311-02325 PART 2 ON OR BEFORE A/C REACHING 50,000 TOTAL AFC. PLANNING TO CONTACT ENGINEERING AFTER 43,000 BUT BEFORE 44,000 CYCLES FOR THE INSPECTION REQUIREMENTS. CYCLES FOR THE INSPECTION REQUIREMENTS. TOMC APPROVES INTERIM REPAIR PER PART 1 ON MAIN CABIN STA 1280 RH FRAME HAVING MULTIPLE GOUGES FROM STR 9R - STR 15R. ACCOMPLISH INSPECTION REQUIREMENTS ON OR BEFORE A/C REACHING 50,000 TOTAL FLT CYCLES. INSP PER PART 2 TO BE DETERMINED BY ENGINEERING BEFORE A/C REACHES NOTED THRESHOLD.