What was found
LHS FRAME 35-36 PRESSURE PANEL HOLE #''S 4-11, 22, 27, 28, 35, 45 AND HOLE AT LONGITUDINAL BEAM AT Y+765 REPAIRED IAW EC/RA 5331-02673. PLACED ON DIP TO "ACCOMPLISH A PERMANENT REPAIR PER PART 3 OF EC/RA 5331-02673 ON OR BEFORE NOVEMBER 4, 2020. PLANNING TO CONTACT ENGINEERING AFTER OCTOBER 1, 2020 BUT BEFORE OCTOBER 22, 2020 FOR THE PERMANENT REPAIR." ACCOMPLISH A PERMANENT REPAIR PER PART 3 OF EC/RA 5331-02673 ON OR BEFORE NOV 4, 2020. PLANNING TO CONTACT ENGINEERING AFTER OCT 1, 2020 BUT BEFORE OCT 22, 2020 FOR THE PERMANENT REPAIR. PART 1 INTERIM REPAIR PEROFMRED. NO PART 2 RECHECKS REQUIRED AT THIS TIME. PART 3 PERM REPAIR TBD BY EG. ACCOMPLISH A PERMANENT REPAIR PER PART 3 OF ECRA 5331-02673 ON OR BEFORE NOVEMBER 4, 20 20. PLANNING TO CONTACT ENGINEERING AFTER OCTOBER 01, 2020 BUT B EFORE OCTOBER 22, 20