Service difficulty report · Drain · Boeing 7879

Difficulty date
February 16, 2023
Submitted
February 17, 2023
Operation
Air carrier
Aircraft
N25982
Make and model
Boeing 7879
Aircraft serial
66139
Aircraft time
11,515 hours, 1,171 cycles
Part
Drain
Part number
NA
Condition
Leaking
Location
Sta 1500-1900
Stage of operation
IN
How discovered
O
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DUE TO WATER OVERFLOW FROM AFT GALLEY COFFEE MAKERS, REF LG 3760336, 3794116, POTABLE WATER LEAKED INTO AFT PIT AND OUT BELLY DRAIN, WITHIN 7 DAYS, ACCOMP. EC/RA 2011- 01000, GALLY SPILL, SECTION 2.B., INDEPTH CLEANUP, IN THE APPROXIMATE ARE FROM STATION 1500 TO BODY STATION 1900, BETWEEN BUTT LINE LT SIDE TO BUTT LINE CENTER. REFER TO ECRA 2011-01000 WITHIN 7 DAYS ACCOMPLISH ECRA 2011-01000 FOR GALLEY SPILL, TOMC-APPROVAL FROM SC1ELBYC COMMENT SECTION 2B, IN-DEPTH CLEANUP, IN THE APPROX AREA FROM STA 1500 TO STA 1900, FROM LEFT SIDE OF ACFT TO RIGHT SIDE OF ACFT FROM MAIN DECK FLOOR TO BELLY OF ACFT. OK TO CARRY FOR IN DEPTH CLEAN UP WITHIN 7 DAYS PER ECRA 2011-0100. AFTERWARDS CREATE DIP FOR SUPPLEMENTAL INSPECTION. RECORDS UPDATE...UK QC QC QC REVIEW QC REVIEWED TA: 7 DAYS...UK TOMCQC REV PERFORMED PERFORMED IN DEPTH CARGO COMPARTMENT CLEAN UP IAW ECRA 2011-01000 2. CORRECTIVE MEASURES B. IN-DEPTH CLEANUP BETWEEN STA 1500 TO STA 1900 BETWEEN LEFT SIDE BUTT LINE TO BUTT LINE CENTER.

More about the Boeing 787-9